|
Lu ZuPing Operation Director, M+W Group, Shangha |
Education and Qualification Ph.D. in Chemical Engineering, Research Institute of Chemical Engineering, South China University of Technology, Guangzhou M.Sc. in Chemical Engineering, Chemical Engineering, East China University of Chemical Technology, Shanghai B.Sc. in Inorganic Chemical Technology, Chemical Engineering, East China University of Chemical Technology, Shanghai Professional Competence Mr. Lu Zuping has over 23 years of professional experience in the field of Chemical Engineering and Me-chanical Engineering. He is currently the operation director for AT/HTI/GI project, responsible for project management. Mr. Lu joined M+W in 1996. Key Projects Photovoltaic Design and Build for Zhonghuan Mono-silicon Manufacturing facility PV Project Phase I, Hohhot, China Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision Gross Building Area: 37,500 m² Site area: 161,000 m² Confidential Client for Thin Film Photovoltaic Facility, Shenzhen, China Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision Gross Building Area: 57,000m² EPC for MEPI Package; ES & EPC contract for Phase 2 Expansion (Tandem 1 line); ES & EPC contract for Tandem Production Line 2 Project (Tandem 2 line) Electronics Design and Build for AUO Kunshan G6 LTPS CF/Array CR, China Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision 80,000 m². class 1k Cleanroom area including: Cleanroom Interiors, HVAC, Mechanical, Process Exhaust Systems, Electrical, Controls and Space Man-agement & Common Pipe Supports. EPCM Open book for AT&S Chongqing I&II + EPC for CR and ME Package, China Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision 130,000m2 buildup area including Fab I&II, CUB, Office, warehouse and etc. 8,000m2 Cleanroom. Design and Build for Micron Xian Backend Facility, China Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision 34,000m2 Buildup Area including Fab, CUB and Office, 13,000m2 Cleanroom SMIC 300 mm Wafer Fab, 28nm Class 1000 with mini-environments, and SMIF, Beijing, China Project Director Phase I 14,000 m². class 1k Cleanroom area including: Cleanroom Interiors HVAC Mechanical Process Exhaust Systems Electrical Controls Space Management & Common Pipe Supports Design and Build for HuanOu 6” Wafer Polished Fab Facility, Tianjin, China Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision Gross Building Area: 13,149 m² Design and Build for General Hook-Up Works, including Electrical Power, Chemical, Gas, UPW, Drain, PCW, PV, CDA and Exhaust Design and Build for STMicroelectronic A&T Project, Shenzhen, China Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision Gross Building Area: 46,184m² This Project includes: one 2-storey FAB building, business center, guard house and, etc. Systems included: All system for A/T Fab Qimonda Fab B, A+T Facility, Suzhou Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision IC Spectrum 8” Wafer Fab, Kunshan Project Manager - Responsible for Project Engineering Confidential Client, KM 5/6, Garage, Kulim, Malaysia Project Manager - Responsible for engineering design and pre-construction of the project Infineon Power Fab, Kulim, Malaysia Design Manager - Responsible for engineering design during the construction of the project Confidential Client, Chengdu, China Project Manager - Responsible for construction of the project Infineon Suzhou BE Facility, Suzhou, China Project Manager - Responsible for engineering design and construction of the project Toppoly Optoelectronics, Nanjing, China Project Manager - Responsible for engineering design and construction of the cleanroom package HeJian 8N Fab, Suzhou, China Design Manager - Responsible for project engineering design National University of Singapore, Singapore Design and Proposal Manager - Responsible for conceptual, basic and detailed engineering design of the project DenseLight Semiconductor, Singapore Senior Mechanical Engineer - Responsible for conceptual, basic and detailed engineering design of the project Dupont Photomask, Shanghai, China Project Manage - Responsible for conceptual/basic engineering design of the project Chartered Semiconductor Manufacturing, Fab 7, Singapore Senior Mechanical Engineer - Responsible for the detailed engineering design of the HVAC systems Systems on Silicon Manufacturing, Singapore Senior Mechanical Engineer - Responsible for detailed engineering design of the HVAC systems General Semiconductor, Tianjin, China Site Project Manager - Responsible for detailed engineering design and the overall site construction man-agement Chartered Silicon Partners Fab 4, Singapore Senior Mechanical Engineer - Responsible for conceptual design of the HVAC systems and the ex-haust/scrubber systems Cypress Semiconductors, Philippine Senior Project Engineer - Responsible for the design and factory construction/assembly of the RO/DI water plant Cam Precision, Malaysia Senior Project Engineer - Responsible for design and factory construction/assembly of the RO/DI water plant Chemical Merck Project, Phase 3, Singapore Senior Mechanical Engineer - Responsible for conceptual/basic engineering design of the project Merck Project, Phase 2, Singapore Senior Mechanical Engineer - Responsible for conceptual, basic and detailed engineering design/site installation of the entire mechanical systems and the cleanroom system Santoku Merck Project, Singapore Senior Mechanical Engineer - Responsible for detailed engineering design/site installation of the HVAC systems, exhaust systems, cleanroom systems as well as the space management Fuji Hunt Photographic Chemicals, Singapore Project Engineer - Responsible for detailed engineering design for the waste water treatment plant and the fume scrubber system General Industry Texas Instruments, Baoyin, China Project Manager - Responsible for engineering design and construction of HVAC and Fire Safety systems Hitachi Cable, Singapore Project Engineer - Responsible for overall design and construction of the cleanrooms and the air-conditioning systems |