Lu ZuPing
Operation Director, M+W Group, Shangha

Education and Qualification

Ph.D. in Chemical Engineering, Research Institute of Chemical Engineering, South China University of Technology, Guangzhou M.Sc. in Chemical Engineering, Chemical Engineering, East China University of Chemical Technology, Shanghai B.Sc. in Inorganic Chemical Technology, Chemical Engineering, East China University of Chemical Technology, Shanghai

Professional Competence

Mr. Lu Zuping has over 23 years of professional experience in the field of Chemical Engineering and Me-chanical Engineering. He is currently the operation director for AT/HTI/GI project, responsible for project management.

Mr. Lu joined M+W in 1996.

Key Projects

Photovoltaic

Design and Build for Zhonghuan Mono-silicon Manufacturing facility PV Project Phase I, Hohhot, China

Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision
Gross Building Area: 37,500 m²
Site area: 161,000 m²

Confidential Client for Thin Film Photovoltaic Facility, Shenzhen, China

Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision
Gross Building Area: 57,000m²
EPC for MEPI Package; ES & EPC contract for Phase 2 Expansion (Tandem 1 line); ES & EPC contract for Tandem Production Line 2 Project (Tandem 2 line)

Electronics

Design and Build for AUO Kunshan G6 LTPS CF/Array CR, China

Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision
80,000 m². class 1k Cleanroom area including:
Cleanroom Interiors, HVAC, Mechanical, Process Exhaust Systems, Electrical, Controls and Space Man-agement & Common Pipe Supports.

EPCM Open book for AT&S Chongqing I&II + EPC for CR and ME Package, China

Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision
130,000m2 buildup area including Fab I&II, CUB, Office, warehouse and etc.
8,000m2 Cleanroom.

Design and Build for Micron Xian Backend Facility, China

Project Director: Responsible for project initial bidding, negotiation, project team setup, and project execu-tion supervision
34,000m2 Buildup Area including
Fab, CUB and Office, 13,000m2 Cleanroom

SMIC 300 mm Wafer Fab, 28nm Class 1000 with mini-environments, and SMIF, Beijing, China

Project Director
Phase I 14,000 m². class 1k Cleanroom area including:
Cleanroom Interiors HVAC Mechanical Process Exhaust Systems Electrical Controls Space Management & Common Pipe Supports

Design and Build for HuanOu 6” Wafer Polished Fab Facility, Tianjin, China

Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision
Gross Building Area: 13,149 m²
Design and Build for General Hook-Up Works, including Electrical Power, Chemical, Gas, UPW, Drain, PCW, PV, CDA and Exhaust

Design and Build for STMicroelectronic A&T Project, Shenzhen, China

Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision
Gross Building Area: 46,184m²
This Project includes: one 2-storey FAB building, business center, guard house and, etc.
Systems included: All system for A/T Fab

Qimonda Fab B, A+T Facility, Suzhou
Project Director - Responsible for project initial bidding, negotiation, project team setup, and project exe-cution supervision

IC Spectrum 8” Wafer Fab, Kunshan
Project Manager - Responsible for Project Engineering

Confidential Client, KM 5/6, Garage, Kulim, Malaysia
Project Manager - Responsible for engineering design and pre-construction of the project

Infineon Power Fab, Kulim, Malaysia
Design Manager - Responsible for engineering design during the construction of the project

Confidential Client, Chengdu, China
Project Manager - Responsible for construction of the project

Infineon Suzhou BE Facility, Suzhou, China
Project Manager - Responsible for engineering design and construction of the project

Toppoly Optoelectronics, Nanjing, China
Project Manager - Responsible for engineering design and construction of the cleanroom package

HeJian 8N Fab, Suzhou, China
Design Manager - Responsible for project engineering design

National University of Singapore, Singapore
Design and Proposal Manager - Responsible for conceptual, basic and detailed engineering design of the project

DenseLight Semiconductor, Singapore
Senior Mechanical Engineer - Responsible for conceptual, basic and detailed engineering design of the project

Dupont Photomask, Shanghai, China
Project Manage - Responsible for conceptual/basic engineering design of the project

Chartered Semiconductor Manufacturing, Fab 7, Singapore
Senior Mechanical Engineer - Responsible for the detailed engineering design of the HVAC systems

Systems on Silicon Manufacturing, Singapore
Senior Mechanical Engineer - Responsible for detailed engineering design of the HVAC systems

General Semiconductor, Tianjin, China
Site Project Manager - Responsible for detailed engineering design and the overall site construction man-agement

Chartered Silicon Partners Fab 4, Singapore
Senior Mechanical Engineer - Responsible for conceptual design of the HVAC systems and the ex-haust/scrubber systems

Cypress Semiconductors, Philippine
Senior Project Engineer - Responsible for the design and factory construction/assembly of the RO/DI water plant

Cam Precision, Malaysia
Senior Project Engineer - Responsible for design and factory construction/assembly of the RO/DI water plant

Chemical

Merck Project, Phase 3, Singapore
Senior Mechanical Engineer - Responsible for conceptual/basic engineering design of the project

Merck Project, Phase 2, Singapore
Senior Mechanical Engineer - Responsible for conceptual, basic and detailed engineering design/site installation of the entire mechanical systems and the cleanroom system

Santoku Merck Project, Singapore
Senior Mechanical Engineer - Responsible for detailed engineering design/site installation of the HVAC systems, exhaust systems, cleanroom systems as well as the space management

Fuji Hunt Photographic Chemicals, Singapore
Project Engineer - Responsible for detailed engineering design for the waste water treatment plant and the fume scrubber system

General Industry

Texas Instruments, Baoyin, China
Project Manager - Responsible for engineering design and construction of HVAC and Fire Safety systems

Hitachi Cable, Singapore
Project Engineer - Responsible for overall design and construction of the cleanrooms and the air-conditioning systems